Planned outage – Aug. 7 from 5-8 a.m.
On Saturday, Aug. 7 from 5-8 a.m., Wake Electric will be conducting scheduled maintenance on our system. This work will require the power to be off at both Emit and Hares substations so we can safely perform this necessary system maintenance. This will affect all of our Johnston and Nash County members as well as our Zebulon members that live below Rt. 97. This work is part of Wake Electric’s continued commitment to provide reliable electric service to our members. Thank you for your patience and we apologize for any inconvenience this work may cause.
To stay up to date with important co-op notices, please be sure your contact information is updated on your account by calling 800.474.6300 or visiting SmartHub.
Quick Links
Recent Posts
- Wake Electric Earns an ACSI® 2025 Customer Satisfaction Award
- Wake Electric to Conduct Aerial Drone Inspections in August to Improve System Reliability
- Local 8th Graders Attend NC State and UNC Basketball Camps Thanks to Wake Electric
- Local Students Represent Wake Electric on Youth Tour to Washington, D.C.
- Wake Electric Thanks Members for Conserving Power During Last Week’s Heat Wave